Check it out!
After
This is a new 48" vanity, with the existing top and sink. Also the existing toilet. At the start of this job the only thing we were supposed to be doing was the stall shower. The water damage however, wouldn't allow us to do just the stall shower and have it be done the right way.
before
plastic shower walls.
before floor
water damaged grout lines, loose floor tiles and moldy trim and vanity base
1/20









At BEEZ Construction we offer a variety of services commercial and residential: Kitchen Remodels, Decks, Bathroom Remodels, Appliance Installation, Additions, and other construction or handyman services.



